
Choose a chemistry analyzer by looking at how your laboratory actually works. Start with the busiest part of the day, the tests requested on each tube, and the time by which the laboratory needs to deliver results. Then turn those observations into a demonstration every supplier can run. A published speed can help you rule out some choices early. A realistic worklist tells you much more about where specimens, staff and reagents will have to wait. [1, 2, 3]
Count specimens and tests separately
Open a week of laboratory records and pick a representative busy hour. Count the tubes that reached the bench and the tests ordered on them. A tube with one order and a tube with a five-test panel each occupy a position, but they create different amounts of analytical work. The time the request was entered may also be different from the time the prepared specimen reached the instrument. Record both if that gap matters to your laboratory.
For an illustration, suppose 70 tubes reach the lab in the first hour and each has an average of five photometric tests, giving 350 photometric tests. In the next hour, 30 tubes with the same average add 150 tests. That is 500 photometric tests over the two hours, before repeats, controls or other work. An analyzer rated for 400 photometric tests in an hour would have a headline speed close to the first-hour demand. Some of the 350 tests can still carry into the next hour because results take time to react and the laboratory has other work to do. [1, 2]
Separate photometry and electrolytes in the estimate
Photometry is a measurement based on light. An ion-selective electrode, often abbreviated ISE, is a different measurement system commonly used for electrolytes such as sodium, potassium and chloride. An analyzer may have both types of measurement, sometimes with ISE supplied as an option. When you read the speed figures, check whether the manufacturer means photometric tests, electrolyte tests or a combined maximum. Look for the figure that describes the work you actually counted. [1, 2]
If 15 of the tubes from the illustrative morning also have sodium, potassium and chloride ordered, those tubes add 45 electrolyte results. Keep that set of results in a separate column. Ask the supplier how the two types are scheduled on the proposed configuration and when all tests in each panel would be ready. A combined rate can sound attractive while telling you very little about the length of time a particular sample will wait for one remaining component.
List which assays have to stay ready
An assay is a test method for measuring something specific. Make a list of the assays the lab will run and mark the ones that need to be available when an order arrives. For each item, record how many bottles it uses, which controls and calibration it requires, and how long the reagent can be used after opening or once loaded. Ask to see how the supplier would arrange that list on the analyzer. A slot count is useful only when you know what occupies the slots.
Suppose a lower-volume assay uses two reagent containers and the lab usually runs it once a day. Compare the value of leaving those containers on the instrument with the time that assay may otherwise need to wait. If keeping the method ready displaces a pack used for high-volume work, ask how the operator will handle an urgent order for either method. This example is a planning exercise. Use the actual reagent instructions and instrument options to choose a workable arrangement. [1, 2, 3]
Time an urgent request in the middle of a normal queue
“STAT” is used for work that needs urgent priority. A dedicated loading position is one way to put an urgent specimen on the analyzer. It still leaves questions about when the machine can load it, when the method can run, and who authorizes the report. For example, Beckman Coulter describes dedicated STAT positions for the AU480. Confirm what happens in each step of the supplied instrument's workflow. [1]
Give the supplier a short worklist. Start with routine samples in progress, then add an approved test order representing an urgent sample. Record the time it becomes ready for the analyzer, is accepted, produces its first result and produces the finished report. Also record the time of the last routine result. If you later repeat the test during a busier period, you can see when the urgent path works smoothly and where it affects other work.
Include a panel that will be finished elsewhere
A chemistry panel may include one assay the laboratory runs on another device or sends to a partner. Put such a panel in the demonstration. See how the staff and software identify the unfinished test after the first part of the panel is available. Ask who updates the expected time and who makes sure the last result joins the correct record.
For a fictional example, a sample arrives at nine o'clock and four results can be run in-house. A fifth result will arrive later from another instrument. If the staff only watch messages on the analyzer, they may think the panel is done when the first four appear. Ask them to open it in the laboratory information system, see the outstanding order, and pass the case to the next person. That is a different task from checking that a test message transfers.
Attach installation, staffing and routine costs to the quote
Have the vendor specify which options and accessories are included. Ask for the installation requirements for the actual device, including the power, space, water and drainage where applicable. If the chemistry analyzer will connect to the laboratory information system, list the license, interface, support and verification arrangements. Count the time staff will use for routine startup, control work, a reagent change and handover. WHO procurement guidance includes planning these continuing needs with the initial equipment purchase. [3]
Use the same comparison period for both quotes. Record which costs are tied to the number of results, which occur every month and which are paid once. Ask who provides training and who answers a service request. If a calibration or reagent replacement interrupts work, have the vendor show what the operator sees. The demonstration will make it easier to decide whether to prepare some items before the busiest period or adjust how staffing is arranged.
Give suppliers one worklist and take the same notes
- State which samples arrive together, the average tests per tube and any rush requests.
- Record the photometric and electrolyte workload in separate columns.
- Check which assays can be ready together under the proposed reagent setup.
- Use approved test records to time a routine panel, an urgent panel and an order with an assay completed elsewhere.
- Record the first result, the last result in the panel and the time of authorization.
- Save the observed times with the configuration, quoted costs and open questions.
After each demonstration, select the biggest delay you observed and ask what would have to change to reduce it. The answer could be a faster analytical stage, a different reagent arrangement, more attention at intake, or better access to the reports that await review. You can then compare how much that change would cost and whether it solves a recurring problem. If you are comparing models for the same workflow, start with the chemistry analyzer catalog and give each supplier the same evidence to work with.
Bring that worksheet back after a few real shifts. Compare the estimated peak workload with the number of tests that actually arrived and the reasons any orders had to wait. If the pressure was concentrated before loading rather than during measurement, the solution might involve preparing specimens earlier or moving a staff task. Keep that observation when you next review capacity.
